Archive for January 2012

31January2012

Concrete Box Culvert Assembly at Inchya Road

In November 2011 Shay Murtagh Precast manufactured and delivered 10 UAN box culvert assemblies on behalf of RJ McLeod contractors for Inchyra Road. Each box culvert assembly consisted of an upper and lower U-section to from a 5.7m by 2.4m culvert. Each U-section weighed 13.5T and was 1.941m long. All of the box culvert units had

    Share This

  • Posted by Jim Leavy  Posted on 31 Jan 2012  0 Comments
  • Read More
30January2012

Shay Murtagh Precast in the Concrete Business 40 years

2012 marks 40 years of Shay Murtagh Precast in business as Precast Concrete Manufacturers. From the very beginning, the company has been committed to continuous investment in the most modern and innovative technologies available and also in increasing our pool of talented people. Today we are very proud to say that that this investment means

    Share This

  • Posted by Gillian Murtagh  Posted on 30 Jan 2012  0 Comments
  • Read More