Archive for October 2012

25October2012

Any questions or comments for our Bridge Design Engineer?

2012 saw Shay Murtagh Precast launch Edition 2 of our Bridge Beam Technical Manual. Many of you who signed up for the Manual helped with Edition 2 in submitting further information requests to which we both replied and included as necessary. Our Senior Bridge Beam Design Engineer has covered all bases.

    Share This

  • Posted by Gillian Murtagh  Posted on 25 Oct 2012  0 Comments
  • Read More
Tunnel Segments for c310
11October2012

Precast Concrete Tunnel Segments for C310 Thames Tunnel

Joint Venture partners HOCHTIEF Solutions AG and J Murphy & Sons Limited (HMJV) have been appointed by state owned Crossrail to undertake the prestigious €220 million C310 Thames Tunnel Project. This project will see the construction of two tunnel’s with a total length of around 5.5 kilometers in southeast London and part of which runs

    Share This

  • Posted by William McGovern  Posted on 11 Oct 2012  0 Comments
  • Read More