Whitechurch Waste Water Treatment Plant

Design, manufacture, supply and erect 7 no prestressed and postensioned concrete storage tanks for waste water treatment plant and reservoir in Whitechurch. Internal Diameter Wall Height Aeration Tank No. 1 10.40m 5.0m Aeration Tank No. 2 7.97m 5.0m Settlement Tank No. 1 8.95m 3.0m Settlement Tank No 2 6.99m 3.0m Balance Tank 7.97m 3.50m Picket

    Share This

  • Posted by Gillian Murtagh  Posted on 28 Jun 2013  0 Comments
  • Read More
26June2013

Grand National Win

On the 1st April last Easter Monday was the highlight in the Irish Racing Calendar. The annual Irish Grand National at Fairyhouse was taking place at 16.50. Running was Liberty Counsel, a mare owned by the family of Vivienne Murtagh, Shay Murtagh Precast Health and Safety Manager.

    Share This

  • Posted by Gillian Murtagh  Posted on 26 Jun 2013  0 Comments
  • Read More
21June2013

Irish Rail Project OB329, Charleville, Co. Cork

Shay Murtagh Precast Ltd. was selected by Irish Rail to design, supply and deliver Bedstones, Bridge Beams and Parapets on Bridge OB329 in Charleville, Co Cork over the busiest rail route in Ireland, the Dublin – Cork mainline. The original stone bridge was demolished in an 8 hour possession the previous night. The new structure was

    Share This

  • Posted by Gillian Murtagh  Posted on 21 Jun 2013  0 Comments
  • Read More
19June2013

Project Omega

Veolia Water / Laing O Rourke (Omega) JV. Design, manufacture, supply and erect 4 no prestressed and postensioned concrete storage tanks for waste water treatment plant in Ballynacor and 2 no prestressed and postensioned concrete storage tanks in Richill. Technical Information: Ballynacor WWTP Internal Diameter Wall Height Settlement Tanks  (4 no.) 24.43m 4.285m Richill WWTP

    Share This

  • Posted by Gillian Murtagh  Posted on 19 Jun 2013  0 Comments
  • Read More
16June2013

Mullingar Sewerage Improvement Scheme – BAM LTD

The Mullingar Sewerage Improvement Works is currently underway which has a total expenditure of €36 million (approx). The works are broken up into two contracts, the first contract awarded to Veolia Water Ireland for the design and build element of the DBO contract and is valued at €24,9m. The construction period is two years, with

    Share This

  • Posted by Gillian Murtagh  Posted on 16 Jun 2013  0 Comments
  • Read More
16June2013

Carillion – Coventry Road Overbridge 159

Deck width 4300mm and thickness of 225mm using 3 No. U11 beams overall length 23450mm. Beams described as Centre, North & South Beam. North Beam & parapet approx weight is 51T South Beam & parapet approx weight is 51T Centre Beam approx weight is 42T

    Share This

  • Posted by Gillian Murtagh  Posted on 16 Jun 2013  0 Comments
  • Read More
12June2013

First Precast Concrete Manufacturer for CE approval from NSAI

Shay Murtagh Precast consistently strives for to meet and achieve the highest standards. To reinforce our position as the leading manufacturer of infrastructural precast products in Ireland and the UK, Shay Murtagh Precast are delighted to announce that we have become first Precast Concrete Manufacturer to achieve approval from the ‘NSAI’ (National Standards Authority of

    Share This

  • Posted by Gillian Murtagh  Posted on 12 Jun 2013  0 Comments
  • Read More
retaining wall
11June2013

Retaining Wall at Dudwell Lane

This project consisted of the manufacture of retaining walls to retain an embankment over a railway line at Dudwell Lane, Halifax, where the existing wall section had collapsed. The client was Network Rail and the contractor was AMCO.

    Share This

  • Posted by Gillian Murtagh  Posted on 11 Jun 2013  0 Comments
  • Read More