Bridge Beams for Hardwicks Bridge Renewal

This project consisted of the renewal of an existing skewed bridge over a two track railway at Wick Road, West Hewish, Somerset. The bridge was single carriageway on steep embankments and Carillion Rail was contracted by Network Rail to upgrade this structure with design by Tony Gee and Partners.

Shay Murtagh Precast had responsibility for the manufacture and design of the bridge deck superstructure.

The new deck comprised of seven number interior S15 standard bridge beams and two number edge SE15 standard bridge beams supported on precast abutment cill beams. The interior S15 beams were 12.47m long and weighed 5.5t. The edge beams weighed 15.5t.

Two abutment cill beams were manufactured for this project and these cill beams were 7.570m long and weighed 16.1t. Along with these Shay Murtagh Precast manufactured and delivered L wall units to the east and west run of the bridge. All were delivered by our in house team and we take this opportunity to thank Mike, Darren and Nia from Carillion on a successful project completion.

You can contact the team at technical@shaymurtagh.co.uk for additional information on bridge beams or sign up to receive a copy of our Bridge Beam Technical Manual.

Read More About Concrete Bridge Beams


Project Location

Form

LiveChat

Click here to Say Hello!

Email

Phone