A lazy image

Carillion – St Denys, Southampton

St. Denys in Southampton Contract, a complex integration of a range of precast concrete sections to refurbish this rail overbridge. It comprised of 8 no bearing beams, 4 no cill beams, 4 no bespoke anchor blocks and 9 no box beams 13.0m in length each. 

The structure completed with individual precast parapet sections. With these parapet sections manufactured with a Lincoln pattern by insitex on external face. While waiting to deliver this structure we performed a trial erection for Carillion at our factory. Then completed the sectional installation program for their onsite team.

The bridge structure, fully assembled for the Client and disassembled and loaded in order of positioning for their Construction Team. In total 22 loads of our manufactured goods shipped to this site in the week pre-construction.

Our transport team worked through the Christmas period for this project and full delivery and assembly was completed on 28th December 2009.

Read More About Concrete Bridge Beams


Project Location

Technical Manuals has moved online

Form

Please enable JavaScript in your browser to complete this form.
Name

LiveChat

Click here to Say Hello!

Email

Phone