In 2012 Shay Murtagh Precast was contracted by Raynesway Construction to manufacture and deliver seven no. Y4 prestressed concrete bridge beams UK for Cray Bridge.

This was for a bridge replacement project for Perth and Kinross Council.

The replacement was considered necessary due to the steel and timber bridges deteriorating condition and the works included a slight widening to allow passage of some larger vehicles.  The beams were 24.7m long and each weighed 26t with an overall width of the completed deck at 6m.

Transportation of the concrete bridge beams Uk were completed by our in house logistics and delivered to schedule.  Installation was done swiftly by the team from Raynesway and beams were lifted into position by a 250 tonne crane.  The bridge was completed four weeks ahead of schedule and officially opened on 16th November 2012.  We congratulate Ally and the Raynesway crew on their successful project.

You can contact the team at technical@shaymurtagh.co.uk for additional information on bridge beams or sign up to receive a copy of our Bridge Beam Technical Manual.

Read More About Concrete Bridge Beams


Technical Manuals has moved online

Form

Please enable JavaScript in your browser to complete this form.
Name

Email

Phone