A lazy image

Concrete Bridge Deck, Ridgepool Pedestrian Footbridge

Concrete Bridge Deck Supplied by Shay Murtagh. The bridge is a two span cable stayed structure over the River Moy. The main span is 47m and the side span 21m. The 25m high curved pylon is a fabricated steel box section clad in GRP and sits on an in-situ concrete pier in the river. Precast concrete units form the deck. These are typically 9.5m long and are post tensioned together at joints. The deck is widened locally around the central pylon.

Shay Murtagh Precast manufactured and supplied the precast concrete bridge deck which was delivered in sections and placed and post-tensioned on site.


Form

Please enable JavaScript in your browser to complete this form.
Name

LiveChat

Click here to Say Hello!

Email

Phone