Two weeks ago we were delighted to have Team Murphy in our manufacturing plant in Raharney alongside Network Rail to carry out survey and measures on our replacement superstructure for Kingsbury Road Bridge in London. This comprised of edge beams and cill beams 16.m in overall length complete with steel beams.
This structure spans the North London Lines and East London Lines and has been installed successfully for our Clients following delivery and placement within the rail possession.
A superb example of a collaborative project and congratulations to everyone involved in handing back ahead of time for the safe passage of trains.